Selected Projects Summary

image

1

Farmanieh Complex

Top-Down Construction

Details
image

2

Babak Bahrami Residential Building

Top-Down Construction

Details
image

3

Saadat Abad Residential Building

Top-Down Construction (SRC)

Details
image

4

NOOR EYE CLINIC PROJECT

STRUT+ANCHORING

Details
image

5

Namjoo Commercial-Office Building

Top-Down Construction

Details
image

6

Motahari Office Building

Top-Down Construction

Details
image

7

Khazar Project

STRUT

Details
image

8

T&K Commercial Project

Responsibilty : EPC Contractor Max. Depth : -36.50 m Stabilization Method : Soil Anchoring Client : MR. Talebpour Location : Tehran , Andarzgoo Blv

Details
image

9

Farhang Multistory Parking Project

Responsibilty : Contractor Max. Depth : -41.0 m Stabilization Method : Soil Anchoring + Concrete Piles Client : Khatam-al Anbia Construction Headquarters

Details
image

10

Zafar Complex Project

EPC Contract

Stabilization Method: Strut

Client: Mr. Imani

Details
image

11

Twin Mokhaberat Towers Project

Responsibility : Consultant Analysis of Foundation Settlement and Subgrade Reaction Modulus Client : Memar Sazeh Alam Co. Location : Tehran, Hemmat Highway

Details
image

12

Esfandiar Project

Responsibilty : EPC Contractor Max. Depth : -21.0 m Stabilization Method : Soil Anchoring + Strut + Concrete Piles Client : Mr. Shebli Location : Tehran , Esfandiar Blvd.

Details
image

13

Tarasht Power Plant

Geotechnical Investigation

Details
image

14

Geotechnical & Geophysical Investigation of Magnesium Oxide Production Plant

image

15

Lale Sadr Project

Responsibilty : EPC Contractor Max. Depth : -31.50 m Stabilization Method : Soil Anchoring Client : Execution of Imam Khomeini’s Order (Behsaz Kashaneh Co.) Location : Tehran , Dibaji st.

Details
image

16

Zafar Project

Responsibilty : EPC Contractor Max. Depth : -17 m Stabilization Method : Strut Client : Mr. Imani Location : Tehran , Zafar st

Details
image

17

Tehran Chamber of Commerce Project

Responsibilty : Consultant of EPC Contractor ( Kayson Inc.) Max. Depth : -24 m Stabilization Method : Top-Down Client : Tehran Chamber of Commerce Location : Tehran , Motahari st.

Details
image

18

Ozgol IT Tower Project

Responsibilty : Consultant Max. Depth : -42 m Stabilization Method : Soil Anchoring Client : Patronak Co. Location : Tehran , Ozgol st.

Details
image

19

Shahr-e-Kord Twin Towers Project

Responsibilty : Consultant Max. Depth : -26.0 m Stabilization Method : Soil Anchoring Client : Patronak Co. Location : Shahr-e-Kord

Details
image

20

Honarmand Project

Responsibilty : EPC Contractor Max. Depth : -18.50 m Stabilization Method : Soil Anchoring Client : MR. Fallah Location : Tehran , Azari st.

Details
image

21

Lidoma Project

Responsibilty : EPC Contractor Max. Depth : -17.50 m Stabilization Method : Soil Anchoring Client : MR. Osanloo Location : Tehran , Saghdoosh st

Details
image

22

Golshahr Project

Responsibilty : Consultant Max. Depth : -32.7 m Stabilization Method : Soil Anchoring Client : MR. Feyzi Location : Tehran , Jordan st.

Details
image

23

Arghavan Project

Responsibilty : EPC Contractor Max. Depth : -20.00 m Stabilization Method : Soil Anchoring Client : MR. Zaman Location : Tehran , Saadat abad st.

Details
image

24

Beasat Project

Responsibilty : Consultant Max. Depth : 21.0 m Stabilization Method : Stabilizing collapsed Excavation by Concrete Pile Method ..... Client : Mr Location : Beasat hwy

Details
image

25

TBM Poratl Project

Responsibilty : EPC Contractor Max. Depth : -11.5 m Stabilization Method : Soil Nailing Client : Arc Rasam Construction Group. Location : Tehran , Fath st.

Details
image

26

Shahid Motahari University Project

Responsibilty EPC Contractor Max. Depth : 19.5 m ( Increase Depth From 11 to 19.5) Stabilization Method : Soil Anchoring Client : Jahan Kosar Co. Location : Tehran , Baharestan Sq.

Details
image

27

Arc 23 Project

Responsibilty : EPC Contractor Max. Depth : -12.0 m Stabilization Method : Soil Nailing + Under Pinning + Truss Client : Arc Rasam Construction Group. Location : Tehran , Saadat Abad , 23th st.

Details
image

28

Nakhlestan Project

Responsibilty EPC Contractor Max. Depth : 14.5 m Stabilization Method : Stabilizing collapsed Excavation by Soil Anchoring + Concrete Pile Method Client : Dr. Kheiri Location : Pardis

Details
image

29

Sepah Project

Responsibilty EPC Contractor Max. Depth : -14.0 m Stabilization Method : Soil Anchoring + Truss Client : Mr. Ramiz Location : Tehran , Jordan st.

Details
image

30

Lavasan Project

Responsibilty : EPC Contractor Max. Depth : 17 m Stabilization Method : Soil Nailing ( Permanent) .....Client : Mr Location : Tehran , Lavasan.

Details
image

31

Negarin Project

Responsibilty : EPC Contractor Max. Depth : 15 m Stabilization Method : Soil Nailing ( Permanent) Client : Mr. Hadjarian Location : Tehran , Naft st.

Details
image

32

Masjed Soleyman Dam Project

Responsibilty : Contractor Max. Depth : More than 180 m in 10 Berms Stabilization Method : Rock Bolt + Anchoring ( Permanent) Client : Pars Soil and Water Engineering Services Development Co. Location : Masjed Soleyman.

Details
image

33

Sardasht Dam Project

Responsibilty : Contractor Max. Depth : 40m Stabilization Method : Rock Dowel ( Permanent) Client : Khatam al-Anbiya Construction Headquarters (Sepasad) Location : Sardasht.

Details
image

34

Almas Project

Responsibilty : EPC Contractor Max. Depth : -16.0 m Stabilization Method : Soil Nailing Client : Azarab Co. Location : Arak

Details
image

35

Zagros Petrochemical Project

Responsibilty : Contractor Ground Improvement Method : Grouting (Manchette Tube System) Client : Zagros Petrochemical Co. Location : Asaluyeh.

Details
image

36

Esfarayen Dam Project

Responsibilty : Contractor Ground Improvement Method : Grouting (Curtain Wall) Client : Qala Construction Co. Location : Esfarayen.

Details
image

37

Wastewater Treatment Plant of Petrochemical Special Economic Zone

Responsibility : Contractor Ground Improvement Method : Self Drilling Micropiles Client : Rahrovan Sanat Asr Maroon Co. Location : Bandar Mahshahr.

Details
image

38

Sadr Elevated Expressway

Concrete Testing Client : Civilization Office of Tehran Municipality Location : Tehran

Details
image

39

Fereshteh Pasargad Hotel

Concrete Mix Design & QC Control Client : Mr. Asadi Location : Tehran

Details
image

40

Karvansaray Sangi Bridges

Concrete Testing Client : Civilization Office of Tehran Municipality Location : Tehran

Details
image

41

(Kharrazi Expressway (Dogaz Bridges

Concrete Testing Client : Civilization Office of Tehran Municipality Location : Tehran

Details
image

42

Atieh Gharb Hospital

Concrete Testing Client : Tolo Atieh Gharb Medical Co. Location : Tehran

Details
image

43

Imam Bagher Educational & Cultural Complex

Weld Inspection Client : Sazeh Paydar Saba Co. Location : Tehran

Details
image

44

Asphalt Testing

Client : Tehran Municipality (Regions 4,5,9,10,17,&19) Location : Tehran

Details
image

45

Abouzar Channel Auxiliary Transition Tunnel

Responsibility : Contractor Ground Improvement Method : Grouting Client : Khatam-al Anbia Construction Headquarters Location : Tehran

Details
image

46

Negin Ofogh Niyayesh Project

Responsibility : Consultant Analysis of Foundation Settlement and Assessment of Pile Foundation Necessity Client : Andishe Khak Saze Location : Tehran , Niyayesh Highway

Details
image

47

Kish Roma Complex Project

Responsibility : Consultant Analysis of Foundation Settlement and Assessment of Pile Foundation Necessity Client : Khaneh Co. Location : Kish

Details
image

48

Tandis Zanbagh Zaferaniyeh Complex Project

Responsibility : Consultant Analysis of Foundation Settlement and Subgrade Reaction Modulus Client : Memar Sazeh Alam Co. Location : Tehran, Hemmat Highway

Details
image

49

Jomhouri Complex Project

Responsibility : Consultant Analysis of Foundation Settlement and Subgrade Reaction Modulus Client : Mr Galavi Location : Tehran, Jomhouri st.

Details
image

50

Improvement of Moddares Silo Complex Project

Responsibility : Consultant Analysis of Settlement and Vulnerability of Steel Silos Client : Government Trading Corporation Location : Tehran-Saveh Highway

Details
image

51

Andarzgoo Complex Project

Responsibility : Contracor Optimization of Stability Design of Excavation Client : Mr. Talebpour Location : Tehran, Andarzgoo st.

Details