Geotechnic

Noor Eye Hospital

Top-Down Construction

About

Responsibility: EPC Contractor

Max. Depth: 26 m

Project Description: A landmark Noor Eye Hospital project featuring the simultaneous execution of two adjoining structures. Structure (No.90) utilized the Top-Down construction method, while Structure (No.92) was built conventionally (Bottom-Up) post-stabilization. The project's core complexity lay in the precise interconnection of both structurally independent yet physically linked buildings

Client: Noor Medical Co.

Location: Tehran, Esfandiar Blvd.