Noor Eye Hospital
Top-Down Construction
Geotechnic
Responsibility: EPC Contractor
Max. Depth: 26 m
Project Description: A landmark Noor Eye Hospital project featuring the simultaneous execution of two adjoining structures. Structure (No.90) utilized the Top-Down construction method, while Structure (No.92) was built conventionally (Bottom-Up) post-stabilization. The project's core complexity lay in the precise interconnection of both structurally independent yet physically linked buildings
Client: Noor Medical Co.
Location: Tehran, Esfandiar Blvd.