Geotechnic

Mirdamad Complex

About

Responsibility: EPC Contractor

Project Description: A project characterized by the concurrent execution of three key phases: Top-Down structural construction, permanent stabilization of excavation walls using a cantilever retaining wall system, and the implementation of an arched, bridge-form ramp to resolve a 12-meter vertical disparity for site entry

Client: Mr Moqadam (Matrix Co.)

Location: Tehran, Mirdamad Blvd.